top of page

FRESNO, CA

Fulton Mall Downtown Beautification Project

Cornerstone was retained for the reconstruction of seven major intersections in downtown Fresno. Circular stamped and colored concrete pavement was placed at each intersection to create a unifying theme.  Due to poor R-value soils and high traffic volumes with a high percentage of trucks, the project Civil Engineer, Tri-City Engineering, required assistance with rebar detailing, expansion joint layout and concrete specifying.  Special consideration was required where the new intersection pavement was required to be placed over existing basements that encroached beyond the building into the street.

bottom of page