top of page

San Lorenzo Valley Middle & High School Library

Felton, CA

Cornerstone provided the construction documents for the new 12,000 square foot cast-in-place concrete, structural steel, and wood framed library building with glulam roof trusses and concrete slab second floor.  This $10 Million project includes a concrete bridge structure that links the upper campus to the second floor of the lower campus.

GET IN TOUCH:

Phone: (559) 320-3200

Fax: (559) 320-3201

986 W. Alluvial Ave, Ste 201

Fresno, CA 93711

  • Facebook
  • LinkedIn

© 2023 CORNERSTONE STRUCTURAL ENGINEERING GROUP, INC.

CONTACT US:

Thanks for submitting!

bottom of page